- Abstract:
- This study applies a Monte Carlo method (MCM) to estimate the uncertainty related to the determination of the annual flow duration curve determined at a river weir, considering the dynamic behaviour of processes and the intrinsic uncertainty contributions to the raw data. The computation of the curve uses a time series of average daily flow data collected at a hydrometric station at an upstream river section. This curve was used for a hydropower plant feasibility study. Results show how model uncertainty can be estimated from the measurement uncertainty of raw data and mathematical formulation applied.
- Keywords:
- Uncertainty; time series; mathematical models; Monte Carlo method; data
- Download:
- IMEKO-TC11-2022-18.pdf
- DOI:
- 10.21014/tc11-2022.18
- Event details
- IMEKO TC:
- TC11
- Event name:
- Joint IMEKO TC11 & TC24 hybrid conference
- Title:
Measurement for a better life
- Place:
- Dubrovnik, CROATIA
- Time:
- 16 October 2022 - 20 October 2022